Here are the floor boards in their final resting places. I can't wait to sand the floor and get it finished. That job is still a way off.

This spot took the longest because we had to rebuild the subfloor before putting the floor down. I jumped up and down on it and it's sturdy.

As of 10 minutes ago we can say the sheet rock is all up and ready for mudding and taping. DH is glad this job is over. He's tired of climbing the ladder.

We had lots of holes to cut for outlets and switches. I'm proud to say we only had one miscut and that was around the air vent for the heater. Nothing I can't fix.

Now I get to cover up all those screw holes and tape the seams. I can't wait. Finally, something I can do without DH.
4 comments:
The home stretch!!! I am amazed at the hard work ya'll have put into this!!
I am in awe of what you do!
I am amazed as well. I am wishing you were all done...for you! And 'cause I can't wait to see pics!
Wow, things are really moving along.
Post a Comment